Your Local, Licensed ADU Construction Company

ADU Contractor Sacramento
| Good Life Construction

Good Life Construction is Sacramento’s trusted ADU builder — delivering complete ADU design, permitting, and construction for garage conversions, attached ADUs, and detached backyard homes.

Good Life Construction Reviews
30K+ Customers
4.8/5 Rating

ADU Options for Every Budget & Timeline

Choose the ADU path that best supports your goals:

  • Price-Friendly ADUs — Cost-effective layouts and finishes that maximize livable space.
  • Pre-Approved ADUs — Sacramento City/County approved plans for faster permitting lead times.
  • Custom ADUs — Architect-designed, fully tailored units for premium backyard living.

Types of ADUs We Build

We construct every major ADU type with precision as a leading ADU contractor in Sacramento:

  • Detached ADU — A self-contained backyard home offering maximum privacy and property value.
  • Attached ADU — A connected addition ideal for family housing or extended living space.
  • Garage Conversion ADU — The most budget-friendly ADU option, perfect for generating rental income quickly.

We provide a fixed, transparent bid built around your budget and priorities.

How Much Does an ADU Cost in Sacramento?

Pricing varies by size, finishes, and site conditions, but typical ADU cost ranges in Sacramento include:

  • Detached ADU: from $220k–$320k+ (higher with premium finishes, utilities, or complex sites)
  • Attached ADU: from $180k–$270k+
  • Garage Conversion ADU: from $150k–$220k+

Average cost per sq ft: ~$250–$300 in Sacramento.

Our Streamlined ADU Construction Process

We operate as a true design–build ADU contractor, keeping every phase coordinated and hassle-free.

1
Feasibility Check

Site review, zoning, setbacks, utilities.

3–10 days
2
Design & Scope

Floor plans, elevations, selections, itemized estimate.

2–4 weeks
3
Permitting

Complete submittal, reviews, comments handled in-house.

~1–2 months
4
Construction

Foundation, framing, MEP trades, finishes, inspections.

~3–6+ months
Handover

Final inspection, warranty packet, maintenance tips.

1–2 weeks

Typical timeline: ~5–11+ months total depending on ADU type, site, and finishes.

Get My ADU Quote

Free on-site consultation in Sacramento—custom ADU plan, timeline, and price.

Build Your ADU With Confidence

As Sacramento’s trusted ADU builder, we create efficient, code-compliant living spaces that deliver long-term value, flexibility, and rental income. Our ADU design–build approach ensures:

  • Predictable, itemized pricing
  • Faster permitting with our in-house team
  • Flexible ADU design options: pre-approved or custom
  • Skilled construction crews and dedicated project managers

Why Choose
Good Life Construction

Licensed • Bonded • Insured (CSLB #979670)
Professional, compliant, and fully protected.

Full-Service, Start to Finish
Everything managed in-house for a seamless project.

Permits & Inspections Included
All approvals handled from start to final sign-off.

Family-Owned & Local Since 2009
Proudly serving the Sacramento community for over a decade.

Free Estimates & Transparent Pricing
Clear, upfront quotes with no hidden costs.

Workmanship Warranty
Quality backed by a reliable warranty for your peace of mind.

About Good Life Construction

Areas We Serve

We provide ADU construction services across Greater Sacramento, including:

Not Sure If We Handle Your Project or Area?

We handle projects of all sizes across Greater Sacramento. If you’re unsure about yours, just ask and we’ll confirm.

BBB A+ Accredited
OSHA Certified
EPA Lead-Safe Certified
IICRC Certified

Reviews

ADU Builder FAQs for Sacramento Homeowners

1Can I build more than one ADU?
In the City of Sacramento, many properties may allow up to two ADUs with a qualifying primary residence. Rules vary by jurisdiction.
2How big can my ADU be?
Detached ADUs up to 1,200 sq ft are allowed. Attached ADUs are limited to ≤50% of the primary home’s size.
3Do you handle permits?
Yes — our in-house team prepares and submits all permits, coordinates reviews, and manages comments.
4Can you work with pre-approved/shelf-ready plans?
Absolutely — both City Pre-Approved and County Shelf-Ready plan sets can speed up approvals.
5How long does ADU construction take?
~5–11+ months total depending on design path, site conditions, and ADU type.

Licensed & insured

Ready to Build Your ADU?

Turn your backyard into new living space, rental income, or a private suite with Sacramento’s trusted ADU design–build contractor.